City of Tallmadge • 46 North Avenue • Tallmadge, Ohio 44278

STREET DEPARTMENT

There are currently fifteen (15) full time employees on staff. The Street Department is responsible for the following duties:

Road Maintenance

  • Patch holes

  • Seal cracks

  • Paving

  • Maintain berms

  • Striping

  • Remove and replace bad sections of both asphalt and concrete streets

  • Provide direction and inspections for citizens and contractors working within the City right-of-ways

Storm Water

  • Design systems

  • Install systems

  • Clean pipes and catch basins

  • Clean ditches and waterways

  • Re-build catch basins and inlets

Cemetery

  • Interments

  • Construct footers for monuments

  • Grounds maintenance

Snow Control

  • Plow and salt roadways

  • Plow and salt City parking lots and sidewalks

Leaf Collection

  • Collect residents leaves

  • Remove leaves from City parks and buildings

Information Center

Copyright 2010 © City of Tallmadge, All Rights Reserved. • Designed by 78 DESIGN HOUSE • Programmed by WIREDVIEWS

Click for the latest Tallmadge weather forecast.